Power System

 

Company Scope of Work Image
Telkomsel Pan Indonesia BTS and MSC power systems, and installation using 20-800 kVA capacity, about 600 units installed. Image result for telkomsel logo
Pakuwon Jati Tunjungan Plaza: 2×2000 kVA, M/E works at basement location, synchronize to existing systems. Related image
Dwijaya Manunggal Royal Plaza: 5×2000 kVA, M/E works at rooftop location, synchronization up to 20 kV systems.  Related image
Nestle Kejayan Plant: 3×2275 kVA, M/E works, 400V-20 kV systems installation, SCADA, complex scenario of powering, synchronization to gas turbine. Related image
First Kuwaiti US Embassy: 3×800 kVA, M/E works, synchronization break-less transfer and switching, with high standard of codes and specification. Image result for First Kuwaiti
Umbra Prasia Mechanical, Electrical, Plumbing installation works. Image result for Umbra Prasia
HM Sampoerna Sukorejo Plant: 5×2000 kVA, M/E works, 400V-20 kV systems installation, SCADA, complex scenario of powering. Image result for hm sampoerna sukorejo
Telkomsel TTC Gayungan: repowering 4×1000 kVA, M/E works, synchronization breakless transfer and switching. Image result for telkomsel logo
Shangri-La Hotel Bali: 3×2000 kVA, M/E works, synchronization up to 20 kV systems. Image result for shangri la logo
Stone Hotel Bali: 2×1500 kVA, M/E works, synchronization. Image result for stone hotel bali logo
Sinar Galaxy Galaxy Mall 1: 5×2000 kVA, M/E works, synchronization. Related image
Pertamina EP Assets 4 Kawengan: 2×1500 kVA, M/E works, synchronization with different genset brand. Image result for pt pertamina ep asset 1
Widatra Bhakti 1×1 MW, gas engine power systems with synchronization up to 20 kV base-load application. Related image
Riken 1×2 MW, gas engine power systems with synchronization up to 20 kV base-load application. Image result for Riken
Ciputra 1×2 MW gas engine power systems with Cogen absorption chiller 400 TR up to 20 kV base-load application. Image result for Ciputra World Surabaya logo
Garuda Food 2×1 MW, gas engine power systems with synchronization up to 20 kV base-load application. Image result for garuda food
Santos Premium Krimer 2×1 MW, gas engine power systems with Cogen absorption chiller, synchronization at 400V base-load application. Image result for Santos Premium Krimer
Tirta Investama (Danone Aqua) 5×1 MW, gas engine power systems synchronization at 400V base-load and island mode application.  Image result for tirta investama
Umbra Prasia 3×1000 kVA, PMC work.  Image result for Umbra Prasia